5,000m² Yantai Factory FOB Yantai Port • 8–15 Days Lead Time Free Design & Custom Logo Packing
Tel: 0535-6789700 Mobile/WhatsApp: +86 18643823759 Email: [email protected]
3-Stage Inspection • EN71 • CE • ASTM • CPC

Quality Control System & International Safety Certifications at Our Yantai Factory

Zero-defect craft manufacturing isn't an accident—it's engineered through incoming polymer testing, inline optical checkweighers, and AQL 2.5 pre-shipment audits.

Automated drill sorting and precision weighing quality control line in Yantai

3-Stage Factory Quality Control Protocol

QC Stage Inspection Checkpoints Instrumentation & Pass Threshold
Stage 1: IQC (Incoming Raw Materials) Velvet fabric gsm, adhesive viscosity & pH, virgin resin drill diameter & DMC shade match Digital micrometer (±0.02mm), D50 color cabinet (ΔE < 1.0), Brookfield viscometer
Stage 2: IPQC (Inline Production) 1440-DPI symbol clarity, 0.20mm glue thickness, +30% extra drill packet count & heat-seal strength 100% inline digital checkweigher (±0.5g); 180° peel adhesion tester (>12 N/25mm)
Stage 3: OQC (Pre-Shipment Audit) Foam-core roll flatness, FNSKU/UPC scan test, ISTA 1.2m carton drop test, moisture check ANSI Z1.4 Level II AQL 2.5 Major / 4.0 Minor; photo/video QC report sent before balance payment

Quality Control & Certification FAQs

What is your factory's Acceptable Quality Limit (AQL) standard for export orders?

Every bulk shipment leaving our 5,000m² Yantai factory passes ANSI/ASQ Z1.4 AQL 2.5 Major / 4.0 Minor final random inspection—with 0.0 Critical Defects tolerated (zero sharp foreign objects, zero chemical odor, zero missing barcode/safety warnings).

Can you provide lab test reports matching Amazon Seller Central CPC and EU GPSR requirements?

Yes. We supply CPSC-accepted third-party lab reports (SGS / TÜV / Intertek) covering ASTM F963, CPSIA total lead & phthalates, EN71-1/2/3, REACH SVHC, and EU General Product Safety Regulation (GPSR) technical documentation files.

Direct Factory Desk • Shandong Yantai

Request Factory Wholesale Pricing, Free Design Proof & Physical Sample Kit

Work directly with our 5,000m² Yantai Diamond Painting & Diamond Art Factory—zero middlemen markups. Submit your project specifications and our senior export engineer will reply within 12–24 business hours with itemized FOB Yantai pricing, 8–15 day production schedule, and a complimentary pixel rendering or custom box dieline.

Direct Export Email (24h Quote Desk) [email protected]
Factory Landline & Mobile / WhatsApp / WeChat Tel: 0535-6789700  |  Mobile: +86 18643823759
Factory Base & Port Terms Economic & Tech Dev Zone, Yantai, Shandong, China • FOB Yantai / CIF / DDP • 8–15 Days Lead Time

Send Inquiry to Yantai Factory Sales Team

Forwarded securely via FormSubmit directly to [email protected].